Eneres

New BBVA Headquarters

Madrid 2009. Las Tablas

Integral concept of energetic architecture. Geothermal installation project.

GENERAL APPROACH TO EFFICIENCY. Main strategies.

The energy design of the building is a fundamental aspect to achieve the objectives of efficiency and sustainability, and in this sense, the integration of energy exchange and generation systems from renewable sources in the building has been considered very important. The building incorporates fluid pretreatment systems, energy recovery, trigeneration, solar utilization and geothermal exchange linked to thermal production with a geothermal heat pump and air conditioning with moderate temperature systems using chilled beams. In addition, a geometric composition that maximizes the use of outdoor conditions.

Promoter
Great George John
Architects
Ortiz y León Architects
Builder
Fernández Molina Works and Services

Scroll to Top